Weill Cornell
The Weill Greenberg Center

Lowy and Donnath was able to negotiate the construction of the sidewalk Network Protector Vaults with Con Edison and construct these network vaults as part of this project thus expediting the completion of the incoming electric service by months.
Rockefeller University
Welch Hall Library Modernization and Restoration

This being a historical renovation, Lowy and Donnath was able to value engineer the 5kV substation. By the use of a tri-plex transformer, Lowy and Donnath was able to install the substation into the building without structural modifications to the historical building.
New York Presbyterian
Electrical Infrastructure Upgrade

Installed new 4160V normal and emergency feeders and substations in an operating facility. Created new electric closets and extended existing loads to the new normal and emergency distribution.
New York Presbyterian
Co-Generation Plant

Coordinated with the hospital and Con Edison to arrange outages in an operating hospital to modify the existing sub-stations and transfer trip circuits for the six incoming 15kV primary services. Lowy and Donnath was retained by NYPH to bring the entire project thru the NYC Fire Department approval process.
Montefiore Medical Center
Children's Hospital

Lowy and Donnath was able to value engineer the use of the existing 480V network to energize the new Children's Hospital in lieu of three new Con Edison 120/208V services. This enabled an accelerated schedule, eliminated need for step-up transformers for motor loads, elevators, and the generator, as well as, creating additional space in the basement for other usage.
New York Presbyterian
David H. Koch Ambulatory Care Center

The project consisted of four 13.8kV services, three generators, ATSs, and fire alarm. Lowy and Donnath was also retained to provide preconstruction services.
Columbia University
North West Corner Building

The building was constructed over the existing gymnasium and connected to existing Pupin and Havemeyer Halls. Coordination with the design team was provided to assure the installed distribution system and fire alarm system were in place to support future lab fit out projects. The US Green Building Council awarded the project LEED Gold.
Columbia University
CEPSR Transformer Upgrade

Coordination with Con Edison was essential in scheduling feeder outages and re-connections, as the facility was to remain active while each service was upgraded. The installation required a custom gantry system to rig out the old equipment and rig in the new equipment, while still providing necessary working clearance for all other active equipment.
New York Presbyterian
Children's Hospital

The facility is served by six new 13.2kV services and associated switchgear which provides utility power for the 168th Street complex. The building was constructed between adjacent NYPH buildings. As a value engineering suggestion, the emergency generators and associated distribution were designed at medium voltage.
Show More
10-37 49th Avenue
Long Island City, NY 11101
P: (718) 392-8222
F: (718) 392-8259

© 2020 by Lowy & Donnath Inc.  

New York Presbyterian

Children's Hospital The facility is served by six new 13.2kV services and associated switchgear which provides utility power for the 168th Street complex. The building was constructed between adjacent NYPH buildings. As a value engineering suggestion, the emergency generators and associated distribution were designed at medium voltage.